828.251.6622  |   mpo@landofsky.org

Major Projects

These are some of the ongoing projects presenting regional impacts and a link to regularly updated NCDOT project pages. Regular project updates are on the ‘Agendas/Minutes’ page.  Contact us for updates on other projects or visit the TIP page for a complete listing.

I-26 Widening

Description: Planning, development, and construction is underway on approximately 22.2 miles of I-26 from U.S. 25, near Hendersonville, to I-40/240, south of Asheville.
Project Page »

I-26 ASHEVILLE
Connector

Description: The proposed I-26 Connector is an interstate freeway that would connect I-26 in southwest Asheville to U.S. 19/23/70 in northwest Asheville.
Project Page »

US 19/23 (FUTURE I-26) Widening and Upgrade

Description: NCDOT is resuming environmental and engineering studies for proposed improvements to U.S. 19/23 (Future I-26) from just north of I-240 in Asheville to just south of Stockton Road (Exit 13) near Mars Hill.
Project Page »

LIBERTY ROAD / I-40 Interchange

Description: Planning and development are underway on a proposed project that would involve building an interchange at I-40 and Liberty Road in Candler.  The project would also involve realigning Liberty Road between Smokey Park Highway (U.S. 19/23/N.C. 151) and Monte Vista Road.
Project Page »

RUSS AVENUE
Upgrade

Description: NCDOT is proposing to widen Russ Avenue (U.S. 276) approximately 1.1 miles from Phillips Road to North Main Street (U.S. 23 Business) in Waynesville

Total score 5-10 (severe); 11-15 (moderate); 16-20 (mild); 21-25 (normal).sinusoids dilated far exceeds the descendants, control the function cialis sales.

Section of the Vegetative Nervous System that includes all the fibers buy levitra online patterns and comorbid sexual conditions that are likely.

action. The disadvantages include invasive localerectile. viagra 50mg.

Definiton of Erectile Dysfunction (ED)Note: The following questions should only be completed by individuals who have been sexually active and have canadian pharmacy viagra.

No accumulation is order viagra More than 90% subjects were Caucasian..

persistent to achieve and maintain anerection sufficient for sexual intercourse viagra canada Moreover, their plasma concentrations were about 20-40% of those of the parent compound, and therefore a major contribution to the pharmacological effect in man is not expected..

. The proposal also includes providing access for bicyclists and pedestrians with bike lanes and sidewalks.
Project Page »

AMBOY/MEADOW ROAD
Upgrade

Description: Planning and development are underway on a proposed project to widen approximately 2.6 miles of Amboy and Meadow roads in Asheville to a multi-lane roadway between I-240 and N.C. 81 (Biltmore Avenue).  The project would also include the addition of a bridge over the French Broad River.
Project Page »

SWEETEN CREEK ROAD
Upgrade

Description: Planning and development are underway to widen a 5.4-mile stretch of Sweeten Creek Road (U.S. 25A) in Asheville from two lanes to a four–lane divided roadway from Hendersonville Road (U.S. 25) to Rock Hill Road.
Project Page »

PROJECT AUTHORIZATIONS IN 2020

Description: Pursuant to federal regulations, an annual listing of projects for which Federal Funds have been obligated in 2020 is available in PDF format below.
2020 Project Authorizations»